Cost of Dirt Backfilling in Gainesville
The cost of dirt backfilling in Gainesville, GA, can vary widely based on several factors. Whether you are preparing a site for construction, landscaping, or other purposes, understanding the elements that influence pricing can help you budget effectively.
Factors Affecting Cost
- Type of Dirt: Different types of dirt, such as topsoil, clay, or fill dirt, have varying costs.
- Volume of Dirt Needed: More dirt means higher costs due to the increased material and transportation expenses.
- Distance from Source: The farther the dirt needs to be transported, the higher the cost.
- Site Accessibility: Hard-to-reach sites may require special equipment, increasing labor costs.
- Labor Costs: Labor rates in Gainesville, GA, can affect the overall cost of the project.
- Permits and Regulations: Local regulations and the need for permits can add to the overall cost.
Average Costs for Common Tasks
Task | Average Cost (Gainesville, GA) |
---|---|
Basic Dirt Backfilling | $1.50 - $3.00 per cubic yard |
Topsoil Backfilling | $12.00 - $18.00 per cubic yard |
Clay Backfilling | $8.00 - $15.00 per cubic yard |
Fill Dirt Delivery | $50.00 - $150.00 per load |
Excavation and Grading | $50.00 - $100.00 per hour |
Labor Costs | $30.00 - $50.00 per hour |